How do I know when to reorder on Shopify?

Order again when a product's stock drops to its reorder point: the units you sell during your supplier's lead time, plus a few days of safety stock. To get a date instead, count the days until you would run out and subtract the lead time and the safety days. That day is the last one to place the order. Do it for each product, and for each size or color that sells at its own pace.

How to work it out

  1. Daily sales: units sold over the last 30 normal days, divided by 30. Leave out days the product was out of stock or on promotion.
  2. Stock you can count on: units on hand, plus an order already on the way if it lands before you would run out.
  3. Days of stock: the stock you can count on, divided by daily sales.
  4. Lead time: the days from placing the order to selling the first unit: production, shipping, customs and receiving.
  5. Reorder point: daily sales times the lead time plus the safety days. When stock reaches this number, order.
  6. Reorder date and quantity: the day you counted, plus the days of stock, minus the lead time and the safety days. Order enough to last until the next order lands: daily sales times the days it should cover.

A worked example

Example: a made-up coffee mug store, not a real business.

On October 1, 2026 it counts 1,800 mugs on hand and has 600 more arriving on October 20. It sells 25 a day. Its factory needs 35 days to make an order and 15 to ship it, so the lead time is 50 days. It keeps 10 days of safety stock and wants each order to last 90 days.

  • Stock it can count on: 1,800 + 600 = 2,400 mugs, since the 600 land before it would run out.
  • Days of stock: 2,400 ÷ 25 = 96 days, so it runs out on January 5, 2027.
  • Reorder point: 25 × (50 + 10) = 1,500 mugs.
  • Reorder date: January 5 minus 60 days is November 6, 2026, the day its stock reaches 1,500.
  • Order quantity: 25 × 90 = 2,250 mugs. Placed on November 6, it lands on December 26 with 10 days of stock left.
Reorder by
Nov 6
Order
2,250 mugs
Reorder point
1,500 mugs
Days until the order must go in36 of 96 days
The last 60 days of stock are the lead time and the safety stock.

It depends

It depends on how steady your sales and your supplier are. Adjust the method when:

  • Sales are seasonal. Use the pace you expect while the order is made and sold, not the pace of the quiet month before.
  • A promotion is coming. Leave past promotion days out of the average, then add the units you plan to sell in the next one.
  • The supplier runs late. Add the delays you have seen to the lead time, or raise the safety days.
  • The factory has a minimum. If the minimum order is more than you need, order the minimum and move the next reorder date out.
  • Stock sits in several places. A total can look fine while one warehouse runs out. Work each location out on its own.
  • The product comes in sizes or colors. Each variant runs out on its own schedule. Work out the fast sellers one by one.

What Arxos does here

Arxos works out the reorder date and quantity for every product from your store's own sales, and warns you before the date.

  • When to reorderA date and a quantity for every product, from your sales pace, the season ahead and your supplier's lead time.
  • When you will run outDays left for every size and color, counting what is already sold and waiting to ship.
  • Every location in one placeStock at each of your locations, with your suppliers and each one's lead time.

Connect your Shopify store and Arxos does this for you, every day.

Free, no sign-up: put in your sales, stock and lead time, and get the date and the quantity.

14 days free. Set up in minutes. Cancel anytime.

Questions owners ask

How often should I check my reorder dates?

At least once a week, and after any day that sells far more than usual. A reorder date moves every time the sales pace changes, so a date worked out once goes stale.

What if my supplier has a minimum order quantity?

Order whichever is larger: what you need, or the minimum. A minimum above your need lasts longer, so the next reorder date moves out, and more cash sits in stock until it sells.

Should I reorder by product or by variant?

By variant when sizes or colors sell at different speeds. A product total can look healthy while the best-selling size runs out, and a stockout in that size loses the sale.

How many days of safety stock should I keep?

Start with a week or two of sales and adjust from your record: more if your supplier has shipped late or your sales swing, less for products you can restock fast. The safety stock guide works it out from your own numbers.